Main Specification:
- Contractor: Nardis
- Client: Iran Gas Engineering and Development Company.
- Scope of Work: EPC
- Location: Hormozgan-Bandar Abbas
Project Summary:
The scope of project is the preparation and installation of two pressure control stations and a pressure reduction station with below specification:
A) Pressure control station at the beginning of the second 30-inch line of Bandar Abbas with a capacity of one million cubic meters per hour.
B) Sarkhon 24-inch Pressure control station with a capacity of 625000 cubic meters per hour.
C) Pressure reducing station at the end of the second 30-inch pipeline of Bandar Abbas with a capacity of one million cubic meters per hour.